A Set Of Gantry Crane With L-Shaped Legs Delivery To Uzbekistan
In June 2017, two months before the final delivery of the project, the customer conducted a site visit at Weihua’ workshop to check the crane meets the requirements and the status of the project. The crane was delivered in August 2017.
“Throughout the project, Weihua had a very professional approach, I am truly happy about the product, service and expertise provided. The crane is so smart. It is beyond our dreams”.says Mr.Sardor.
>> Previous:Weihua Produce World's Longest Pipe Belt Conveyor
>> Next:Bridge Crane Installation For Qinghai Electric Power
>> Next:Bridge Crane Installation For Qinghai Electric Power
Contact us