Multi-Function Cranes Phase II Project
![ulti-Function Cranes Phase II Project](/d/file/news/company-news/2017-12-07/11d83841b76283bdff58101cbca335cb.jpg)
On November 30, 2017, Phase II project of Laibin Yinhai Aluminum Company was put into operation. The multi-function electrolytic aluminum crane crafted by Weihua was officially put into use.
After one year of construction, the second phase project of Laibin completed the power-on test. And the annual output of electrolytic aluminum belts and primary aluminum will reach 500,000 tons. All multi-functional electrolytic cells of the second phase are produced by Weihua, and the successful launch of this project is a big leap for Weihua in electrolytic lifting industry.
![ulti-Function Cranes Phase II Project](/d/file/news/company-news/2017-12-07/082e679d03ae498cf315649e375a14c2.jpg)
Electrolytic aluminum multi-purpose crane is a large pre-baked aluminum electrolysis equipment, which is mainly employed to complete the following process operations :
1. Shell: Open the electrolyte crust;
2. Replace the anode: pull out the residual pole, put on a new anode;
3. Slag: pull out the residual pole, remove blocks in the molten aluminum;
4. Feeding: add alumina powder and covering material to the groove;
5. Lifting: lifting bus frame.
![ulti-Function Cranes Phase II Project](/d/file/news/company-news/2017-12-07/271c55488f6fd98af20bbb70a4150924.jpg)
>> Previous:Weihua Group Rated as China Model Manufacturer
>> Next:RMG Crane for Steel Track Handling
>> Next:RMG Crane for Steel Track Handling
Contact us